Current Location >> Projects >> All Projects
  Suction Anchors for STP Floating Production System at Panyu Field...    (2008-07-02 11:38:07)
  Suction Anchors Installation at WenChang 13-1, 13-2 Oil Field...    (2008-07-02 11:36:34)
  Dry Work Chamber for Sea-Bottom Pipeline Repairing in the Boxi Area...    (2008-07-02 11:35:13)
  Two Berthing Dolphins with Double Buckets Suction Foundations at JZ9-3...    (2008-07-02 11:33:33)
  Two Mooring Platforms with Bucket Foundations at JZ9-3 Field...    (2008-07-02 11:32:08)
  Two Suction Foundation Platforms Installed at Huludao...    (2008-07-02 11:30:33)
  The STP Floating Production System at Lufeng 22-1 Field...    (2008-07-02 11:28:56)
  Suction Piles for Sliding Resistance of Zili Jack-up Rig...    (2008-07-02 11:27:01)
  Two Points Mooring of Appraisal Production Test System at QHD32-6-4 Oi...    (2008-07-02 11:19:27)
  Two Points Mooring of Appraisal Production Test System in JZ9-3 Oil Fi...    (2008-07-02 11:09:01)
  Two Point Mooring of Appraisal Production Test System in CFD1-6-1 Oil ...    (2008-07-02 10:56:33)
  Maoming Bohe Meteorology Observation Station...    (2008-06-18 09:48:20)
  Research of export transmission system plan of Liaodong Bay New Lvda O...    (2008-06-18 09:47:54)
  Analysis of installation of flexible standpipes and dynamic cables of ...    (2008-06-18 09:47:30)
  Emergency repair of WZ11-4A to WZ12-1 submerged pipeline...    (2008-06-18 09:47:01)
 
1 | 2 >>  Total21 Message(s)
Copyright Neptune Offshore Engineering Development Co.,ltd. Tianjin All Right Reserved.  津ICP备08001326号